2013 - 2015 Leuven

Abscis Architecten -

The existing cyclotron building is right in the centre of the Teaching Hospital on the Gasthuisberg campus. The planned extension includes a completely new programme for the commercial production of FDG, which can be realised on the existing roof terrace above the cyclotron. The same level houses the conventional radio pharma laboratories, a large part of which must keep working during the refurbishment works. The level underneath houses the cyclotron with adjacent rooms and the programme here is restricted to the re-organisation of the quality control lab and the insertion of a cargo lift to the upper floor.

Right in between the different clusters, some communal rooms such as storage, administration and toilets, are located, which simultaneously act as a buffer between the two radioactive zones on level 1. Within these zones, a system of airlocks (to get changed in) and pressure differences guarantees the required clean-room level and the prevention of contamination between the different rooms. The required continuity in production of the conventional radio pharma requires a carefully planned phased approach of disassembly and re-assembly of existing rooms and techniques, which is a deciding factor in the lay-out of this cluster. Close consultation between the different design team partners and with client and users has been of the utmost importance. The designed building unit is a result of the lay-out generated and the required free heights. By treating existing and new units in the same way, a new architectural unit has been created. 

Abscis Architecten -
Abscis Architecten -
Abscis Architecten -
Abscis Architecten -

Follow us on facebook

To facebook

Discover these Education and research Projects

Expansion of the veterinary medicine college. Merelbeke
Campus Platteput. Buggenhout
VLOT Lokeren. Lokeren
renovation Campus Ledeganck. Gent
KUL Campus Bruges. Brugge
Royal Athenaeum Ninove. Ninove